Aravana production resumes at Sabarimala
The unit will initially produce around 1.5 lakh tins a day, with output expected to rise to around 3.5 lakh tins daily after October 20. At full capacity, the plant can produce between 3.25 lakh and 3.65 lakh tins a day, TDB said.