Power Shutdown by KPDCL
SRINAGAR, DECEMBER 19: Chief Engineer, Distribution, KPDCL has informed that the Shutdown of 33 KV Habak-Zakura-Burzhama line will be observed due to which power supply to Danihama, Khimber, Teilbal, Burzhama, Rahbagh, Batapora, Zakura, IE Zakura and adjoining areas will be affected on 21 December, 2025 from 11 AM to 02 PM. Similarly, shutdown of 33 [] The post Power Shutdown by KPDCL appeared first on Kashmir Media Watch .