The Economic Times
Elections 2026Economy / The Economic Times
Infrastructure projects see cost overrun of Rs 3.4 lakh cr: MoSPI
25 Aug 2026 5:46 pm
28 C
Infrastructure projects see cost overrun of Rs 3.4 lakh cr: MoSPI