The Times of India
Elections 2026Chennai / The Times of India
Detailed project report prepared for Tirupattur - Hosur railway line
As per the DPR, the Tirupattur -Hosur line will be constructed at a cost of Rs 4,000 crore.
11 Feb 2026 11:54 pm

20 C